Bosnia's HEV completes Bocac 2 HPP project - Hydro Balkans
+44 207 394 30 90 (London)

Bosnia’s HEV completes Bocac 2 HPP project

Main » News » Bosnia’s HEV completes Bocac 2 HPP…

Bosnian hydro power company Hidroelektrane na Vrbasu (HEV) has completed the construction of a hydro power plant in the municipality of Mrkonjic Grad, the office of the president of the country’s Serb Republic entity said.

Hidroelektrane na Vrbasu invested 42 million marka ($24.7 million/21.5 million euro) in the construction of the 8.76 MW Bocac 2 hydro power plant, which will employ 32 people, the Serb Republic presidential office said in a statement.

“Such facilities produce energy and stability, which is our priority. In the future, the Serb Republic will have to build more such facilities,” the entity president, Milorad Dodik, said during the official launch of the hydro power plant.

HEV is part of Bosnian power utility Elektroprivreda Republike Srpske.

The Serb Republic is one of the two entities that form Bosnia. The other is the Federation.

(1 euro = 1.95583 Bosnian marka)

Source: renewablesnow.com

MORE:

Serbia to invest 800 mln euro in overhaul of hydro power plants – report

Author: grendelkhan. License: Creative Commons, Attribution-ShareAlike 2.0 Generic. BELGRADE (Serbia), October 8 (SeeNews) – Serbian state-owned power utility Elektroprivreda Srbije (EPS) plans to invest 800 million euro ($878.3 million) in the overhaul of hydro power plants across the country, news agency Tanjug reported. The investment will ensure the stability of electricity production from hydro power…


State-owned Hidroelectrica submits letter of intent for CEZ assets in Romania

Romania’s largest power producer Hidroelectrica, 80%-controlled by the state, has submitted a non-binding letter of intent for purchasing the assets of Czech utility group CEZ in Romania, Hidroelectrica CEO Bogdan Badea confirmed at an energy conference, according to Economica.net. The interest for the assets is high, CEZ speakesperson Ladislav Kriz said quoted by Profit.ro. CEZ…


Montenegro’s EPCG gets loan from Germany’s KfW for hydro plant overhaul

SARAJEVO (Reuters) – Montenegro power utility EPCG EPCG.MOT signed a 33 million euro ($36.5 million) loan deal with German state-owned development bank KfW [KFW.UL] on Wednesday to help fund the overhaul of three turbines at its 307 megawatt (MW) Perucica hydro power plant. The deal is a part of the KfW’s ongoing 80-million-euro Greening Public…


HPP BUK BIJELA

In March 2019 Serbia and Republika Srpska (RS) intend to jointly build the hydropower plant (HPP) Buk Bijela. The installed capacity of more than 180 MW, will equally contribute

to the energy stability of Serbia and the RS. HPP Buk Bijela will be built about 11.6 kilometres upstream from Foča. It is planned to be equipped with three hydro generators with

a total capacity of 93 MW, with the expected average annual electricity generation at around 330 GWh. The project would require an investment of EUR 193 million. Elektroprivreda Srbije (EPS) is currently reviewing the project for HPPs Buk Bijela, to be followed by determining the pace of implementation.

OVERHAUL OF DJERDAP 1,2 HPPS

At the end of 2017, EP S announced its intention to overhaul 10 units of HPP Đerdap 2 over 10 years, to help ex tend the plant ’s lifespan and boost its capacity by 50 MW. EPS and Siloviye Mashiny are cooperating on the overhaul of HPP Đerdap 1. The overhaul began in 2009. In Jul y 2018, the t wo companies signed a contract on the modernization of the A2 and A3 units in or der to complete the revitalization of the entire HPP in 2021.

CONSTRUCTION OF 2 SMALL HYDROPOWER PLANTS

EPS (Serbian state-owned power utility) plans the construction of 2 small hydropower plants on existing dams – SHPP Celije and SHP P Rovni. The project is a part of the programme for reconstruction of SHPPs through the loan of EBRD. The programme encompasses the reconstruction of 15 SHP Ps with total installed capacity of 18 MW. The project also includes the supply of electrical and mechanical equipment and their installation. Once the tender documents are signed, the works will be completed within 62 weeks.