Main actvites: electromechanical hydropower solutonsn spherical and buterry valvesCompany entry:ČKD Blansko is one of leading providers of solutons in hydropower industry. Following a traditon ofover 100 yearsn CKD Blansko provides turn-key electro-mechanical solutons and full scope of supportngactvites: hydraulic research and testngn designn manufacturen erecton and commissioning for newinstallatonsn refurbishmentsn upgrades and overhauls. CKD Blansko provides innovatve solutonsendorsed by experience of our technical personnel for largen medium and small hydro power plants aswell as pump storage power plants. Modern in-house manufacturing facilites ensure top qualitynreliability of delivered equipment and short lead tmes. In-house optmizaton of performance throughhydraulic designn supported by model tests in own laboratory with four dedicated test rigs ensures stateof the art innovatve designn capable of meetng the most demanding requirements of the customer.Our new and existng clients highly value our focus on environmentally friendly solutonsn rexibility andexcellent support during operaton.
 
Gellhornova 1
678 01 Blansko
Czech Republic
Tel: +420 516 402 900
Fax: +420 516 417 344
E-mail: hydro@ckdblansko.cz
www.ckdblansko.cz

HPP BUK BIJELA

In March 2019 Serbia and Republika Srpska (RS) intend to jointly build the hydropower plant (HPP) Buk Bijela. The installed capacity of more than 180 MW, will equally contribute

to the energy stability of Serbia and the RS. HPP Buk Bijela will be built about 11.6 kilometres upstream from Foča. It is planned to be equipped with three hydro generators with

a total capacity of 93 MW, with the expected average annual electricity generation at around 330 GWh. The project would require an investment of EUR 193 million. Elektroprivreda Srbije (EPS) is currently reviewing the project for HPPs Buk Bijela, to be followed by determining the pace of implementation.

OVERHAUL OF DJERDAP 1,2 HPPS

At the end of 2017, EP S announced its intention to overhaul 10 units of HPP Đerdap 2 over 10 years, to help ex tend the plant ’s lifespan and boost its capacity by 50 MW. EPS and Siloviye Mashiny are cooperating on the overhaul of HPP Đerdap 1. The overhaul began in 2009. In Jul y 2018, the t wo companies signed a contract on the modernization of the A2 and A3 units in or der to complete the revitalization of the entire HPP in 2021.

CONSTRUCTION OF 2 SMALL HYDROPOWER PLANTS

EPS (Serbian state-owned power utility) plans the construction of 2 small hydropower plants on existing dams – SHPP Celije and SHP P Rovni. The project is a part of the programme for reconstruction of SHPPs through the loan of EBRD. The programme encompasses the reconstruction of 15 SHP Ps with total installed capacity of 18 MW. The project also includes the supply of electrical and mechanical equipment and their installation. Once the tender documents are signed, the works will be completed within 62 weeks.