Croatia’s HEP Group posts EUR 184 million net profit for 2018 - Hydro Balkans
+44 207 394 30 90 (London)

Croatia’s HEP Group posts EUR 184 million net profit for 2018

Main » News » Croatia’s HEP Group posts EUR 184 million net…

Croatia’s state-owned energy company Hrvatska Elektroprivreda (HEP Group) reported a net profit of HRK 1.36 billion (around EUR 184 million) in 2018, an increase of 5% compared to 2017. The profit came from the group’s electricity business, with losses seem in other segments of operations, according to HEP Group’s annual report.
HEP Group posted an operating profit of HRK 1.66 billion (around EUR 224.5 million) in 2018, a decrease of 27.7% against 2018 due to a stronger increase in operating expenses than in operating revenues.

In 2018, the group had a financial profit of HRK 24.7 million (about EUR 3.34 million), after posting a financial loss of HRK 704.1 million (about EUR 95.2 million) in 2017. The change is reflected in the increased net profit for 2018, according to the annual report.

Favorable hydro conditions marked 2018

Operating revenues stood at HRK 15.2 billion (around EUR 2 billion), an increase of HRK 229 million (about EUR 31 million), compared to 2017, mainly due to sales revenues increasing by HRK 780.1 million (5.8%), or about EUR 105.5 million.

Operating expenses stood at HRK 13.5 billion (about EUR 1.83 billion), going up by HRK 865.4 million (EUR 117 million) compared to 2017.

The increase was due to the higher purchase cost of sold gas (by 61.4%), mostly due to gas supply to domestic customers, an operation that was not conducted in 2017, as well as a 119% surge in the cost of CO2 emissions compared to 2017 and a 1.6% rise in the purchase price of electricity, due to higher costs of offtake of power produced from renewable energy sources and at cogeneration plants.

HEP Group’s investments in 2018 were worth HRK 2.38 billion (around EUR 321.9 million). The investments were financed from the company’s own sources thanks to good liquidity.

At the end of 2018, HEP Group had 11,011 employees, 883 fewer than at the end of 2017, due to downsizing as part of the reorganization of distribution system operator (DSO) HEP ODS in November 2017.

Revenues from electricity sales up 1.4%
HEP Group reported HRK 11.7 billion (about EUR 1.58 billion) in revenues from electricity sales in 2018, which accounted for 77% of the company’s operating revenues last year. The 1.4% increase in revenues from electricity sales compared to 2017 was due to stronger electricity sales to buyers in Croatia and HEP’s wider share of sales to business customers, as well as a rise in the average selling price for business customers.

HEP sold 14.6 TWh of electricity to domestic buyers (881 GWh more than in 2017) and 2.9 TWh of electricity on neighboring markets (769 GWh less than in 2017).

The company’s market share in electricity supply to domestic customers grew to 89.1%, while entry into regional markets (Slovenia, Bosnia and Herzegovina, and Serbia) strengthened HEP Group’s position as the market leader in electricity supply, according to the annual report.

Favorable hydro conditions marked 2018, with hydropower plants (HPP) producing 6.9 TWh of electricity, which was by 1.9 TWh (38.7%) more than in 2017, with the thermal power plant output declining by 838 GWh (20.7%).

Source: balkangreenenergynews.com

MORE:

Serbia to invest 800 mln euro in overhaul of hydro power plants – report

Author: grendelkhan. License: Creative Commons, Attribution-ShareAlike 2.0 Generic. BELGRADE (Serbia), October 8 (SeeNews) – Serbian state-owned power utility Elektroprivreda Srbije (EPS) plans to invest 800 million euro ($878.3 million) in the overhaul of hydro power plants across the country, news agency Tanjug reported. The investment will ensure the stability of electricity production from hydro power…


State-owned Hidroelectrica submits letter of intent for CEZ assets in Romania

Romania’s largest power producer Hidroelectrica, 80%-controlled by the state, has submitted a non-binding letter of intent for purchasing the assets of Czech utility group CEZ in Romania, Hidroelectrica CEO Bogdan Badea confirmed at an energy conference, according to Economica.net. The interest for the assets is high, CEZ speakesperson Ladislav Kriz said quoted by Profit.ro. CEZ…


Montenegro’s EPCG gets loan from Germany’s KfW for hydro plant overhaul

SARAJEVO (Reuters) – Montenegro power utility EPCG EPCG.MOT signed a 33 million euro ($36.5 million) loan deal with German state-owned development bank KfW [KFW.UL] on Wednesday to help fund the overhaul of three turbines at its 307 megawatt (MW) Perucica hydro power plant. The deal is a part of the KfW’s ongoing 80-million-euro Greening Public…


HPP BUK BIJELA

In March 2019 Serbia and Republika Srpska (RS) intend to jointly build the hydropower plant (HPP) Buk Bijela. The installed capacity of more than 180 MW, will equally contribute

to the energy stability of Serbia and the RS. HPP Buk Bijela will be built about 11.6 kilometres upstream from Foča. It is planned to be equipped with three hydro generators with

a total capacity of 93 MW, with the expected average annual electricity generation at around 330 GWh. The project would require an investment of EUR 193 million. Elektroprivreda Srbije (EPS) is currently reviewing the project for HPPs Buk Bijela, to be followed by determining the pace of implementation.

OVERHAUL OF DJERDAP 1,2 HPPS

At the end of 2017, EP S announced its intention to overhaul 10 units of HPP Đerdap 2 over 10 years, to help ex tend the plant ’s lifespan and boost its capacity by 50 MW. EPS and Siloviye Mashiny are cooperating on the overhaul of HPP Đerdap 1. The overhaul began in 2009. In Jul y 2018, the t wo companies signed a contract on the modernization of the A2 and A3 units in or der to complete the revitalization of the entire HPP in 2021.

CONSTRUCTION OF 2 SMALL HYDROPOWER PLANTS

EPS (Serbian state-owned power utility) plans the construction of 2 small hydropower plants on existing dams – SHPP Celije and SHP P Rovni. The project is a part of the programme for reconstruction of SHPPs through the loan of EBRD. The programme encompasses the reconstruction of 15 SHP Ps with total installed capacity of 18 MW. The project also includes the supply of electrical and mechanical equipment and their installation. Once the tender documents are signed, the works will be completed within 62 weeks.