ELSEWEDY ELECTRIC acquires a portfolio of renewable energy assets in operation in Greece - Hydro Balkans
+44 207 394 30 90 (London)

ELSEWEDY ELECTRIC acquires a portfolio of renewable energy assets in operation in Greece

Main » novosti » ELSEWEDY ELECTRIC acquires a portfolio of…

The completion date is expected to be on or before the 28th of June 2019 and subject to the normal terms and conditions for completing similar transactions
Cairo, Egypt:

ELSEWEDY ELECTRIC, a leading Integrated Energy and Infrastructure Solution Provider announces entering into a Share Purchase Agreement with R.F. Energy S.A. (a subsidiary of F.G Europe S.A.) to acquire 100% of the share capital of 3 wind and 1 hydro-electric energy companies in operation in Greece for a total consideration of €55 million. This will be funded by a ring-fenced project finance facility from National Bank of Greece (NBG) covering up to 75% of the value, with the balance to be paid in equity. The completion date is expected to be on or before the 28th of June 2019 and subject to the normal terms and conditions for completing similar transactions.

The 4 Companies have an aggregate capacity of 63.6 MW, three wind parks; “Aioliki Kilindrias SA”, “Kallisti Energeiaki SA”, “Aioliki Aderes SA” and one Small Hydro Power Plant “Hydroelectriki Achaias SA”. The assets generate enough energy to power approximately 34,000 homes with an equivalent carbon dioxide (CO2) footprint of 102 thousand tons.

The assets benefit from a fixed tariff for all of the generated capacity under Power Purchase Agreements (PPA) for tenors vary between 12 years to 20 years. The PPAs stipulate that the public utility off-taker “DAPEEP” (Diacheiristis Ananeosimon Pigon Energias kia Eggyiseon Proelefsis S.A.) guarantees the purchase of all the energy produced at the parks. The parks are located at Ermioni in Argolida, Tsouka in Arcadia, Kilkis in Macedonia and Achaia. The assets benefit from existing infrastructure and interconnections. All the wind parks use Vestas Wind Turbine Generators (WTG) and are under Operation & Maintenance contract with “Vestas Hellas Wind Technology S.A.R.F. Energy S.A.”.

“The transaction is considered a remarkable milestone for the group by expanding into the Renewable Energy sector and include Wind and Hydro-electric energy under ELSEWEDY ELECTRIC umbrella with geographical expansion in Europe. ELSEWEDY ELECTRIC is now one of the top renewable energy operators in Greece. Moreover, this investment is our second Independent Power Producer (IPP) Project in the EMEA region after Benban Solar Power Plant in Egypt. As part of ELSEWEDY ELECTRIC Corporate Social Responsibility, we will always be seeking investment opportunities that provide sustainable solutions and added-value for the general good of people.”, said Ahmed Elsewedy, President & CEO of ELSEWEDY ELECTRIC.

Source: ZAWYA

MORE:

EPCG to invest EUR 700 million to build new renewables capacities, upgrade other facilities

Author: Vladimir Berbatović Source: Balkan Green Energy News https://balkangreenenergynews.com/epcg-to-invest-eur-700-million-to-build-new-renewables-capacities-upgrade-other-facilities/ State power utility Elektroprivreda Crne Gore (ЕPCG) will invest a total of EUR 700 million to build new renewable energy capacities and upgrade its other power generation facilities to bring them into line with environmental standards, with the aim of reducing dependence on imports due to hydrologic conditions,…


EPS to invest EUR 4.6 billion by 2027, EUR 700 million to go into hydropower, renewables

Author: Vladimir Spasić Source: Balkan Green Energy News https://balkangreenenergynews.com/eps-to-invest-eur-4-6-billion-by-2027-eur-700-million-to-go-into-hydropower-renewables/ Public power utility Elektroprivreda Srbije (EPS) intends to invest EUR 4.6 billion from 2019 to 2027, of which EUR 1.6 billion in the modernization of existing and construction of new thermal power plants (TPPs) as well as environmental protection, EUR 1,3 billion in distribution projects, EUR 1 billion…


Romanian hydropower company spends EUR 80 mln to refurbish 350MW power plant

Romania’s state-owned hydropower company Hidroelectrica will totally refurbish its hydropower plant (CHE) Râu Mare – Retezat under a EUR 80 million project, financed from own funds. The plan’s capacity will increase to 350MW after the process, Economica.net reported. The company wants to make CHE Râu Mare – Retezat the country’s largest supplier of system services,…


HPP BUK BIJELA

In March 2019 Serbia and Republika Srpska (RS) intend to jointly build the hydropower plant (HPP) Buk Bijela. The installed capacity of more than 180 MW, will equally contribute

to the energy stability of Serbia and the RS. HPP Buk Bijela will be built about 11.6 kilometres upstream from Foča. It is planned to be equipped with three hydro generators with

a total capacity of 93 MW, with the expected average annual electricity generation at around 330 GWh. The project would require an investment of EUR 193 million. Elektroprivreda Srbije (EPS) is currently reviewing the project for HPPs Buk Bijela, to be followed by determining the pace of implementation.

OVERHAUL OF DJERDAP 1,2 HPPS

At the end of 2017, EP S announced its intention to overhaul 10 units of HPP Đerdap 2 over 10 years, to help ex tend the plant ’s lifespan and boost its capacity by 50 MW. EPS and Siloviye Mashiny are cooperating on the overhaul of HPP Đerdap 1. The overhaul began in 2009. In Jul y 2018, the t wo companies signed a contract on the modernization of the A2 and A3 units in or der to complete the revitalization of the entire HPP in 2021.

CONSTRUCTION OF 2 SMALL HYDROPOWER PLANTS

EPS (Serbian state-owned power utility) plans the construction of 2 small hydropower plants on existing dams – SHPP Celije and SHP P Rovni. The project is a part of the programme for reconstruction of SHPPs through the loan of EBRD. The programme encompasses the reconstruction of 15 SHP Ps with total installed capacity of 18 MW. The project also includes the supply of electrical and mechanical equipment and their installation. Once the tender documents are signed, the works will be completed within 62 weeks.