EPHZHB breaks ground for 66 MW Vrilo pumped-storage hydropower plant - Hydro Balkans
+44 207 394 30 90 (London)

EPHZHB breaks ground for 66 MW Vrilo pumped-storage hydropower plant

Главная » News » EPHZHB breaks ground for 66 MW Vrilo…

Public power utility Elektroprivreda Hrvatske Zajednice Herceg Bosne (EPHZHB) held a groundbreaking ceremony for the Vrilo pumped-storage hydropower plant on the Šuica sinking river near Tomislavgrad on July 16 .
The Vrilo pumped-storage hydropower plant, to be built in an investment worth EUR 89.1 million, is designed to have two units with a total installed capacity of 66 MW, with operations planned to begin in 2023. The plant’s annual electricity output is projected at 196 GWh, according to an announcement on the company’s website.

EPHZHB is majority owned by the Federation of Bosnia and Herzegovina (FBiH) and is one of the Bosnian entity’s two power utilities. The entity of Republika Srpska also has a power utility.

Mostar-based EPHZHB reported a profit of BAM 237,441 (about EUR 120,000) in 2017, which it used for covering losses from previous years. It produced 1,287 GWh of electricity last year, down 18.26% compared to the planned level due to drought.

The company produces electricity solely from renewable energy sources, with most of its capacities consisting of hydropower plants.

Earlier this year, EHZHB unveiled Mesihovina, Bosnia and Herzegovina’s first wind farm.

Source: balkangreenenergynews.com

MORE:

EBRD has acquired stake in Ictas Surdurulebilir Enerji Yatirimlari, the renewable energy arm of Turkey’s IC Holding for $100m

The EBRD’s investment is expected to provide new boost to Turkey’s renewable energy sector. Ictas Surdurulebilir Enerji Yatirimlari owns a portfolio of ten hydropower plants with a total capacity of 400MW. With the funding, the company expects to invest in wind and solar power with a combined capacity of up to 250MW. The investment will…


Romania’s Govt. renews promises for 10% IPO at Hidroelectrica

Romania’s Government plans to launch an initial public offer (IPO) for the sale of a 10% stake in hydropower producer Hidroelectrica and a 15% stake in coal and power company CE Oltenia, according to the 2019-2022 Convergence Program, passed by the Government on May 8. The offers would include the issuing of new shares by…


EPCG’s new investment cycle focuses on portfolio diversification, hydropower projects

A Belgrade consortium comprising engineering firm Energoprojekt Hidroinženjering and water management institute Jaroslav Černi has been selected to produce a conceptual design for hydropower plant (HPP) Komarnica, and has already prepared an environmentally acceptable technical solution, which paves the way for the construction of the power plant following decades of research, Igor Noveljić, CEO of…