HPP “Perućica” – 4th Annual International Summit and Exhibition: Hydropower Balkans
+44 207 394 30 90 (London)

HPP “Perućica”

HPP “Perućica” is the oldest large hydropower plant in Montenegro, and was put into operation in 1960. Its installed capacity is 307 MW.

HPP “Perućica” revitalization includes the reconstruction and modernization of hydromechanical and electrical equipment in units A5, A6 and A7, the reconstruction of the Opačica and Moštanica channels, as well as the distributed control system, and the revitalization of the units A1, A2, A3, A4 and A5 is also expected. Also HPP Perućica will get new, 58.5 MW unit, its eighth in a row, which will cost EUR 23 million.