Montenegro Gains 20 Million EUR for Water Management - Hydro Balkans
+44 207 394 30 90 (London)

Montenegro Gains 20 Million EUR for Water Management

Main » News » Montenegro Gains 20 Million EUR for Water…

Based on the Sava and Drina corridor integrated development program, which represents new and one of the largest regional initiatives in recent years in the field of integrated water resources management, Montenegro will have at its disposal about 20 million EUR for projects aimed at improving water management in the Drina River basin.

The Drina corridor has significant potential for hydropower generation, food production and tourism development.

20 March 2019 – Based on the Sava and Drina corridor integrated development program, which represents new and one of the largest regional initiatives in recent years in the field of integrated water resources management, Montenegro will have at its disposal about 20 million EUR for projects aimed at improving water management in the Drina River basin, according to the report by the country’s Ministry of Agriculture and Rural Development.

This allocation of funds was agreed at the first meeting of the representatives of the Drina and Sava River Basin States – Bosnia and Herzegovina, Serbia, Slovenia, Croatia and Montenegro, with representatives of the World Bank on the launch of the regional Sava-Drina Corridor Program with a total value of 220 million EUR.

“At the meeting held in Brčko, Bosnia and Herzegovina, Montenegrin interests were represented by the State Secretary in the Ministry of Agriculture and Rural Development, Đuro Žugić and the Director General of the Directorate for Water Management, Momčilo Blagojević. The meeting was attended by the World Bank’s Regional Director for Western Balkans Linda Van Gelder and the Country Manager for Bosnia and Herzegovina, and Montenegro in the Europe and Central Asia region of the World Bank, Emanuel Salinas “the statement read.

The economy and jobs in the Western Balkans region depend heavily on shared water resources such as Sava-Drina waterways, to transport goods, generate energy, grow food and fibres, sustain biodiversity and provide for leisure and eco-tourism. As the Sava flows from west to east across Slovenia, Croatia, Bosnia and Herzegovina reaching the Danube in Serbia, the river opens the opportunity to regain some of its former position as an important transportation corridor that simultaneously requires interventions to manage floods. The Drina corridor, on the other hand, has significant potential for hydropower generation, food production and tourism development.

The long-term objective of the Sava-Drina River Corridor Integrated Development Program is to foster regional cooperation and unlock productive investments. This regional program, through a range of studies, policy dialogue and investments would aim to strengthen capabilities and economic development of the riparian countries, by jointly selecting priorities for support in technical assistance, dialogue, institutional strengthening, and investment with a focus on the accession process non-EU members and compliance agenda of new members.

Perhaps just as important, the program will also be a relatively uncontroversial opportunity for the countries of the region to signal their ability and willingness to tackle transboundary issues together.

Source: Total Montenegro news

MORE:

Montenegro’s EPCG gets loan from Germany’s KfW for hydro plant overhaul

SARAJEVO (Reuters) – Montenegro power utility EPCG EPCG.MOT signed a 33 million euro ($36.5 million) loan deal with German state-owned development bank KfW [KFW.UL] on Wednesday to help fund the overhaul of three turbines at its 307 megawatt (MW) Perucica hydro power plant. The deal is a part of the KfW’s ongoing 80-million-euro Greening Public…


Consultant sought to help launch renewable energy auctions in Kosovo

Author: Balkan Green Energy News The European Bank for Reconstruction and Development (EBRD) has invited expressions of interest in providing it with consultancy services in order support the Government of Kosovo* in developing and implement a competitive scheme for the award of future support to renewable energy generators. The EBRD previously engaged with the Kosovo*…


Montenegro govt endorses concession deal with PM Hydro for HPP construction

PODGORICA (Montenegro), September 6 (SeeNews) – Montenegro’s government has approved a concession agreement with local company PM Hydro for the construction of a 995 kW hydro power plant (HPP), it said on Friday. The project envisages the construction of a hydro power plant on Vranjestica river in Kolasin municipality, which will produce 3.35 GWh of…


HPP BUK BIJELA

In March 2019 Serbia and Republika Srpska (RS) intend to jointly build the hydropower plant (HPP) Buk Bijela. The installed capacity of more than 180 MW, will equally contribute

to the energy stability of Serbia and the RS. HPP Buk Bijela will be built about 11.6 kilometres upstream from Foča. It is planned to be equipped with three hydro generators with

a total capacity of 93 MW, with the expected average annual electricity generation at around 330 GWh. The project would require an investment of EUR 193 million. Elektroprivreda Srbije (EPS) is currently reviewing the project for HPPs Buk Bijela, to be followed by determining the pace of implementation.

OVERHAUL OF DJERDAP 1,2 HPPS

At the end of 2017, EP S announced its intention to overhaul 10 units of HPP Đerdap 2 over 10 years, to help ex tend the plant ’s lifespan and boost its capacity by 50 MW. EPS and Siloviye Mashiny are cooperating on the overhaul of HPP Đerdap 1. The overhaul began in 2009. In Jul y 2018, the t wo companies signed a contract on the modernization of the A2 and A3 units in or der to complete the revitalization of the entire HPP in 2021.

CONSTRUCTION OF 2 SMALL HYDROPOWER PLANTS

EPS (Serbian state-owned power utility) plans the construction of 2 small hydropower plants on existing dams – SHPP Celije and SHP P Rovni. The project is a part of the programme for reconstruction of SHPPs through the loan of EBRD. The programme encompasses the reconstruction of 15 SHP Ps with total installed capacity of 18 MW. The project also includes the supply of electrical and mechanical equipment and their installation. Once the tender documents are signed, the works will be completed within 62 weeks.