Slovenia, Bulgaria receive EUR 76 million in EU financing for cross-border power lines - Hydro Balkans
+44 207 394 30 90 (London)

Slovenia, Bulgaria receive EUR 76 million in EU financing for cross-border power lines

Main » novosti » Slovenia, Bulgaria receive EUR 76 million in EU…

Slovenia, Bulgaria receive EUR 76 million in EU financing for cross-border power lines

EU Member States have approved EUR 48.2 million in aid under the Connecting Europe Facility (CEF) to Slovenian transmission system operator (TSO) ELES for the construction of the first power line between Slovenia and Hungary, as well as EUR 28.6 million to Bulgarian TSO ESO for the construction of the power line between Bulgaria and Greece.
The overall investment in the interconnection line between Zerjavenec (Croatia)/Heviz (Hungary) and Cirkovce (Slovenia) is expected to reach EUR 102.5 million and in the power line between Maritsa East 1 (Bulgaria) and Nea Santa (Greece) EUR 56 million.

The Member States’ vote concerns EUR 800 million in CEF financial aid for studies and works for a total of 14 projects, including 7 for electricity, 2 for smart grids, 2 for CO2 cross-border transportation and 3 for gas, the European Commission said in a press release, adding that electricity and smart grids received EUR 504 million.

These projects were selected under the call for proposals launched in June and closed in October 2018.

The cross-border project implemented by ELES envisages the construction of the 80.5 km long double circuit 400kV overhead line Cirkovce-Pince and the new 400 kV Cirkovce substation, both in Slovenia.

The new double 400 kV OHL will be connected to one circuit of the existing double circuit 400kV OHL Heviz (Hungary)-Zerjavinec (Croatia).

According to ENTSO-E, the project will establish two new cross-border lines – Heviz-Cirkovce and Cirkovce-Zerjavinec.

Slovenia, Hungary, Italy get access to markets in the east
The project will allow Slovenia, Hungary, Italy and surrounding countries to access energy markets in the east, including import, and improve reliability and security of supply, ELES said in its project documentation.

The project is also essential for the successful completion of the smart grid project SINCRO.GRID, ENTSO-E said.

The project implemented by ESO concerns the construction of a new AC 400 kV interconnection line between Bulgaria and Greece and new AC 400 kV lines at the south of Bulgaria.

The power line is 122 km long on the Bulgarian territory and 29 km on the Greek territory, ESO said in a press release.

According to ENTSO-E, the new power lines will contribute to the reduction of electricity prices for consumers in the south part of the region by providing access to cheaper sources of generation in the north-east part. The project will also increase the integration of renewables in the north part of Greece.

Source: Balkan Green Energy News

MORE:

EPCG to invest EUR 700 million to build new renewables capacities, upgrade other facilities

Author: Vladimir Berbatović Source: Balkan Green Energy News https://balkangreenenergynews.com/epcg-to-invest-eur-700-million-to-build-new-renewables-capacities-upgrade-other-facilities/ State power utility Elektroprivreda Crne Gore (ЕPCG) will invest a total of EUR 700 million to build new renewable energy capacities and upgrade its other power generation facilities to bring them into line with environmental standards, with the aim of reducing dependence on imports due to hydrologic conditions,…


EPS to invest EUR 4.6 billion by 2027, EUR 700 million to go into hydropower, renewables

Author: Vladimir Spasić Source: Balkan Green Energy News https://balkangreenenergynews.com/eps-to-invest-eur-4-6-billion-by-2027-eur-700-million-to-go-into-hydropower-renewables/ Public power utility Elektroprivreda Srbije (EPS) intends to invest EUR 4.6 billion from 2019 to 2027, of which EUR 1.6 billion in the modernization of existing and construction of new thermal power plants (TPPs) as well as environmental protection, EUR 1,3 billion in distribution projects, EUR 1 billion…


Romanian hydropower company spends EUR 80 mln to refurbish 350MW power plant

Romania’s state-owned hydropower company Hidroelectrica will totally refurbish its hydropower plant (CHE) Râu Mare – Retezat under a EUR 80 million project, financed from own funds. The plan’s capacity will increase to 350MW after the process, Economica.net reported. The company wants to make CHE Râu Mare – Retezat the country’s largest supplier of system services,…


HPP BUK BIJELA

In March 2019 Serbia and Republika Srpska (RS) intend to jointly build the hydropower plant (HPP) Buk Bijela. The installed capacity of more than 180 MW, will equally contribute

to the energy stability of Serbia and the RS. HPP Buk Bijela will be built about 11.6 kilometres upstream from Foča. It is planned to be equipped with three hydro generators with

a total capacity of 93 MW, with the expected average annual electricity generation at around 330 GWh. The project would require an investment of EUR 193 million. Elektroprivreda Srbije (EPS) is currently reviewing the project for HPPs Buk Bijela, to be followed by determining the pace of implementation.

OVERHAUL OF DJERDAP 1,2 HPPS

At the end of 2017, EP S announced its intention to overhaul 10 units of HPP Đerdap 2 over 10 years, to help ex tend the plant ’s lifespan and boost its capacity by 50 MW. EPS and Siloviye Mashiny are cooperating on the overhaul of HPP Đerdap 1. The overhaul began in 2009. In Jul y 2018, the t wo companies signed a contract on the modernization of the A2 and A3 units in or der to complete the revitalization of the entire HPP in 2021.

CONSTRUCTION OF 2 SMALL HYDROPOWER PLANTS

EPS (Serbian state-owned power utility) plans the construction of 2 small hydropower plants on existing dams – SHPP Celije and SHP P Rovni. The project is a part of the programme for reconstruction of SHPPs through the loan of EBRD. The programme encompasses the reconstruction of 15 SHP Ps with total installed capacity of 18 MW. The project also includes the supply of electrical and mechanical equipment and their installation. Once the tender documents are signed, the works will be completed within 62 weeks.