Romania’s Govt. unveils 2019-2030 energy sector strategy draft - 4th Annual International Summit and Exhibition: Hydropower Balkans
+44 207 394 30 90 (London)

Romania’s Govt. unveils 2019-2030 energy sector strategy draft

Main » novosti » Romania’s Govt. unveils 2019-2030 energy sector…

Romania’s Energy Ministry announced on Monday, March 18, that it has launched in public debate the draft “Energy Strategy of Romania 2019-2030, with the perspective of 2050”.

The public’s comments and suggestions can be submitted to the Energy Ministry’s headquarters within 15 calendar days of the date of publication of this notice.

Romania would need total investments in the energy sector between EUR 15 and 30 billion for the period 2018-2030, with a central estimate of about EUR 20 billion, according to the strategy.

The key strategic investments are outlined in the revised document: the 3rd and 4th units at Cernavoda nuclear power plant (pictured), the reversible (pumped) hydropower plant at Tarnita Lapustesti, the 600MW coal-fired power unit at Rovinari and the hydropower plant on the Danube at Turnu Magurele-Nicopole, in partnership with Bulgaria.

Source: Romania-Insider.com

MORE:

EPCG to invest EUR 700 million to build new renewables capacities, upgrade other facilities

Author: Vladimir Berbatović Source: Balkan Green Energy News https://balkangreenenergynews.com/epcg-to-invest-eur-700-million-to-build-new-renewables-capacities-upgrade-other-facilities/ State power utility Elektroprivreda Crne Gore (ЕPCG) will invest a total of EUR 700 million to build new renewable energy capacities and upgrade its other power generation facilities to bring them into line with environmental standards, with the aim of reducing dependence on imports due to hydrologic conditions,…


EPS to invest EUR 4.6 billion by 2027, EUR 700 million to go into hydropower, renewables

Author: Vladimir Spasić Source: Balkan Green Energy News https://balkangreenenergynews.com/eps-to-invest-eur-4-6-billion-by-2027-eur-700-million-to-go-into-hydropower-renewables/ Public power utility Elektroprivreda Srbije (EPS) intends to invest EUR 4.6 billion from 2019 to 2027, of which EUR 1.6 billion in the modernization of existing and construction of new thermal power plants (TPPs) as well as environmental protection, EUR 1,3 billion in distribution projects, EUR 1 billion…


Romanian hydropower company spends EUR 80 mln to refurbish 350MW power plant

Romania’s state-owned hydropower company Hidroelectrica will totally refurbish its hydropower plant (CHE) Râu Mare – Retezat under a EUR 80 million project, financed from own funds. The plan’s capacity will increase to 350MW after the process, Economica.net reported. The company wants to make CHE Râu Mare – Retezat the country’s largest supplier of system services,…